Once you've chosen your kitchen, the next question is usually how long you'll be without one. Most installations take one to two weeks on site, but it depends on the work involved.
A typical sequence
- Strip-out: removing the old kitchen
- First fix: any changes to plumbing and electrics
- Preparation: making good walls and floors
- Installation: fitting units, doors and drawers
- Worktops: some are fitted straight away, others are templated after the units go in
- Finishing: appliances, splashbacks, sinks and taps
- Handover: a final clean and walkthrough
What makes it take longer?
- Moving the sink, hob or appliances
- Knocking through a wall
- New flooring or plastering
- Worktops that need templating and making to measure
Keeping disruption down
We agree the programme with you before work starts, so you know which days you'll be without a sink or cooker. Read our tips for living without a kitchen.
See our kitchen installation service, or get in touch to plan your project.